Friday Jan 12, 2007

Final Inspections

We had the final inspections last week and we passed. That means that should someone get hurt due to a massive failue of the kitchen infrastructure, we should be covered, insurance-wise. It also means that the plumbing is "to-code", despite the extreme level of bozosity of the plumber.

We still have to get the final patchwork done and the door between the laundry room and kitchen installed, but we're basically good-to-go.

Comments:

Post a Comment:
Comments are closed for this entry.